This was done as a design/build project which included upgrading the electrical service to accommodate installing the CT scanner in the space. The design criteria required making sure that radiation would be properly shielded with leaded drywall, doors, frames, and windows; they also involved analyzing the HVAC systems in relation to covering any added heat loads from the CT unit (we did not have to increase the air conditioning based on the CT scanner manufacturer’s guidelines). In addition we refreshed finishes in the space.